PRODUCTION CAPABILITIES

Nameplate, And
What We Can Actually Take

Both figures are below. The second is the one that answers a buyer’s real question, and it is maintained monthly.

Where The Capacity
Actually Sits

An aluminium and fibre plant runs denser per square metre than a solid-timber factory — no timber yard, no kilns, no heavy sanding line, bought-in extrusion and knockdown packing. That is why the output figure looks high against the footprint, and we would rather explain it than have it queried in an audit.

The constraint here is rarely the machines. It is the rope bench and the sewing room, because those scale with trained people rather than with capital.