CONTRACT & HOSPITALITY
A Hotel Opening
Date Does Not Move
Contract is not retail with a bigger order. It is a different construction, a different warranty, a different approval sequence and a different obligation after handover.
We run it as a separate path because the evidence a specifier needs barely overlaps with what an importer needs.
CONTRUCTION
Contract Grade,
Stated In Units
ELEMENT
RESIDENTIAL
CONTRACT
Frame section
Standard wall
Increased wall, stated per product
Coating
60–80 μm
80–100 μm, extended salt spray
Fasteners
304
316 / A4
Seating test
EN 581-2 domestic
EN 581-2 contract level
Fabric abrasion
Per programme
50,000+ double rubs; 100,000+ lobby
Stackability
Optional
Specified, with stack height and protection
Glides
Standard
Replaceable, spares supplied with order
Warranty
2 years
To be stated — valid for commercial use
HOW A PROJECT RUNS
Nine Stages Against A Fixed Date
WHERE OUR WORK GOES
Resort Systems &
Luxury Housing
Two segments already carry a meaningful share of our order book, and both are the reason our contract construction exists as a separate specification.